Recovery Boiler Project

Service Type: Supply Only
Location: Prince George BC
Completion: 2011
Size: 4340 SQ. FT.

Project Details

Sitting atop a 100’ existing structure, Ferro supplied our client a 62’ x 70’ building that was to house various hydraulic equipment. It was engineered and loaded for both a 2-Ton, and Monorail Crane system. Ferro also supplied support beams and brackets for both cranes as well as a specially fabricated 6’ x 11’ door that allowed the monorail crane to swing outwards at an irregular angle. The building was bolted to existing columns. Two large site cranes were used in the installation process due to the height of the building.