Menu

Recovery Boiler Project

Sitting atop a 100’ existing structure, Ferro supplied our client a 62’ x 70’ metal building that was to house various hydraulic equipment. It was engineered and loaded for both a 2-Ton, and Monorail Crane system. Ferro also supplied support beams and brackets for both cranes as well as a specially fabricated 6’ x 11’ door that allowed the monorail crane to swing outwards at an irregular angle. The pre-engineered building was bolted to existing columns. Two large site cranes were used in the installation process due to the height of the building.

Service Type:
Size:

Call us for an estimate
1-866-443-3776